Highlights
- On-track installation of track-bed layers while operations continue on adjacent track(s)
- Ballast bed cleaning with efficient excavation of material and triple-deck ballast screening
- Ballast reconditioning increases the quality of cleaned ballast
- Efficient use of track possessions thanks to integrated supply of new ballast
- Integrated track tamping for improving the track geometry immediately after rehabilitation
- Proof of layer thickness of the formation protective layer and ballast bed thanks to laser measuring system